| 1991 Sep 12 | UARS Launch from Cape Kennedy on Space Shuttle Discovery (STS-48) | LAUNCH |
| 1991 Sep 19 | First day of useful atmospheric measurements | MLSEQ0? |
| 1991 Oct 17 | MLS scan pattern changed to emphasize lower stratosphere, zero views once per orbit | MLSEQ04 |
| 1991 Oct 31 | Antenna Scan Bias added | MLSEQ06 |
| 1991 Dec 4 | Antenna Scan bias changes sign when oblateness changes direction | MLNOM0 |
| 1992 Jan 14 | MMIF 29 changed from a target view to a space view | MLNOM0_B |
| 1992 April 8 | MLS oblateness correction resolution changed from 2.5 km to 1.25 km | MLNOM0_C |
| 1992 Sep 25 | MLS science integration time changed from 1.792 to 1.728 sec | |
| 1992 Nov 16 | MLNOM1_D | |
| 1993 Apr 24 | MLS 183 GHz radiometer shut-off due to mixer failure | |
| 1993 May 19 | MLNOM1_G | |
| 1993 May 27 | MLNOM0_H | |
| 1993 Dec 23 | MLS experiences first antenna scan actuator anomaly | |
| 1994 Jan 6 | Scan program auto restart | MLNOM0_I |
| 1994 Jan 19 | MLNOM1_J | |
| 1994 Apr 12 | MLS intermittent operation due to scan anomalies | |
| 1994 Feb 3 | Scan actuator heater management started | |
| 1994 Apr 12 | MLS duty cycle reduced to preserve scan actuator life | |
| 1994 Oct 1 | Scan anomalies recur, operation intermittent | |
| 1994 Nov 4 | Closed loop scan started | MLSCAN_T4 |
| 1995 Jan 25 | Reverse scan started - eliminating scan anomalies | MLREVSE0_C |
| 1995 Feb 1 | Limb track on low latitude turn around started on all full vertical scan days | MLREVSE0_D |
| 1995 Jun 3 | Started 2 day full vertical scan and 1 day 18 km limb track scan as standard operating mode | MLS1HT1_C |
| 1996 Sep 22 | Optimized limb tracking days for gravity wave measurments by using 2.5km oblateness correction | MLS1HT1_E |
| 1997 Jun 3 | UARS Battery 1 declared failed, UARS begins two battery operation | |
| 1998 Jun 1 | MLS experienced recurrence of scan slips. | |
| Chronology of UARS MLS Operational mode changes | ||
|---|---|---|
| 1993 Apr 24 | MLS 183 GHz radiometer shut-off due to mixer failure | |
| 1995 Feb 1 | Limb track on low latitude turn around started on all full vertical scan days | |
| 1995 Jun 3 | Started 2 day full vertical scan and 1 day 18 km limb track scan as standard operating mode | |
| 1996 Sep 22 | Optimized limb tracking days for gravity wave measurments by using 2.5km oblateness correction | |
| 1998 Aug 3 | Added auto restart and recovery from scan slips to maximize vertical scan attempts | |
| Chronology of UARS MLS Survival mode changes | |
|---|---|
| 1991 Sep 12 | UARS Launch from Cape Kennedy on Space Shuttle Discovery (STS-48) |
| 1991 Sep 12 | Continuous Heater bus power |
| 1993 Oct 3 | Cycled Heater bus power |
| 1995 Jun 24 | Failed 183 GHz subsystem cycling for minimum peak power |
| 1996 Aug 3 | Both Heater bus and Failed 183 GHz subsystem cycling for minimum S/C night power |
| 1998 | Move Heater bus and Op heater cycling from ATC to PMON & TMON processors |
| Chronology of UARS MLS Special Tests | ||
|---|---|---|
| 1991 Sep 15 | MLS initial in-orbit activation | |
| 1991 Sep 27 | MLS Characterization tests | |
| 1991 Sep 28 | MLS Characterization tests | |
| 1991 Sep 29 | MLS Characterization tests | |
| 1991 Sep 30 | MLS Characterization tests | |
| 1992 May 1 | UARS Disturbance Test | MLJTR1_0 |
| 1992 Oct 11 | Moon Calibration Test | MLMOON |
| 1992 Dec 13 | Moon Calibration Test | MLMOON2_1 |
| 1993 Jan 2 | Moon Calibration Test | MLMOON2_2 |
| 1993 Apr 27 | 183 GHz Mixer anomaly test #1 | |
| 1993 Apr 29 | 183 GHz Mixer anomaly test #2 | |
| 1993 May 13 | 183 GHz Mixer anomaly test #3 | |
| 1993 May 27 | 183 GHz Mixer anomaly test #4 | |
| 1993 Jun 21 | 183 GHz Mixer anomaly test #5 | |
| 1993 Jul 8 | 183 GHz Mixer anomaly test #6 | |
| 1993 Jul 27 | 183 GHz Mixer anomaly test #7 | |
| 1993 Sep 3 | 183 GHz Mixer anomaly test #8 | |
| 1993 Sep 17 | 183 GHz Mixer anomaly test #9 | |
| 1993 Sep 17 | UARS Disturbance Test #2 | MLJTR1_1 |
| 1993 Dec 3 | Moon Calibration Test | MLMOON2_4 |
| 1993 Dec 24 | Moon Calibration Test | MLMOON2_5 |
| 1994 Mar 29 | Moon Calibration Test | MLMOON2_6 |
| 1994 Sep 23 | Moon Calibration Test | MLMOON?_7 |
| 1993 Nov 9 | 183 GHz Mixer anomaly test #10 | |
| 1993 Nov 30 | 183 GHz Mixer anomaly test #11 | |
| 1994 Dec 16 | Moon Calibration Test | MLMOON1_A |
| 1993 Dec 20 | 183 GHz Mixer anomaly test #12 | |
| 1994 Jan 5 | 183 GHz Mixer anomaly test #13 | |
| 1994 Jan 19 | 183 GHz Mixer anomaly test #14 | |
| 1994 Feb 4 | 183 GHz Mixer anomaly test #15 | |
| 1995 Mar 8 | Moon Calibration Test | MLMOON2_8 |
| 1995 Mar 9 | Moon Calibration Test | MLMOON3_8 |
| 1995 Mar 20 | Moon Calibration Test | MLMOON??? |
| 1995 Mar 21 | Moon Calibration Test | MLMOON??? |
| 1995 Dec 7 | Moon Calibration Test | MLMOON??? |